urlaubsverwaltung
Zeiterfassung und Urlaubsverwaltung mit Weitblick: alle gängigen Arbeitsfunktionen plus Fürsorge-Faktor.
Direct answer
urlaubsverwaltung is a startup tracked by VC Deal Flow Signal through its public GitHub activity. This profile records its commit velocity, contributors, and signal type as a benchmark for investors.
Current Signal, Q4 2026
urlaubsverwaltung shows -41% commit velocity change with 51 active contributors (+28% growth). Signal type: Deceleration. Trend vs. prior quarter: decelerating (was +37% in Q3 2026).
Engineering acceleration is a sustained rise in a startup's public GitHub output - commits, contributors, new repositories, relative to its own baseline. It is a quantitative signal computed from public data, unrelated to accelerator programs.
Data sourced from public GitHub activity. Read our methodology
Engineering Metrics, Q4 2026
Commit Velocity (14d)
109
Velocity Change
-41%
Contributors
51
+28% growth
New Repos (30d)
0
Free with email signup
Projected lead-time window
no active window
Projected next milestone
Platform or stack transition
The free Sunday digest puts urlaubsverwaltung and 780 other startups we track in context, 14-day acceleration deltas, contributor maps, and the top names not on Crunchbase yet. Five names every Sunday, no card, no code-reading.
Unlock with email →Projections are model estimates derived from each org's public commit signal and the SSRN-published methodology, not statements of fact. Cross-reference with primary sources before acting.
Engineering Velocity Report Card
Velocity Score
52/100
Moderate, Moderate activity above baseline
Commit Velocity Change
-41%
Contributor Growth
+28%
New Repositories
0
Signal Type
Deceleration
Signal History
| Period | Velocity (14d) | Change | Contributors | Growth | New Repos | Signal |
|---|---|---|---|---|---|---|
| Q4 2026 | 109 | -41% | 51 | +28% | 0 | Deceleration |
| Q3 2026 | 183 | +37% | 51 | +28% | 0 | Framework migration |
| Q2 2026 | 55 | -33% | 51 | +28% | 0 | Deceleration |
| Q1 2026 | 82 | +1% | 51 | +28% | 0 | Framework migration |
What This Signal Means for Investors
Related Startups in HR Tech
RBND-studio
dailydotdev
backend-br
minthcm
polar-bear-org
Cla-Code-Community
Similar Momentum in Other Sectors
Frequently Asked Questions
What is urlaubsverwaltung's current engineering signal?
As of Q4 2026, urlaubsverwaltung shows a "Deceleration" signal with -41% commit velocity change over a 14-day window, 51 active contributors, and +28% contributor growth. This indicates a technology stack transition, which often precedes a pivot or platform upgrade.
Is urlaubsverwaltung raising a funding round?
VC Deal Flow Signal does not predict specific funding rounds. However, urlaubsverwaltung's engineering acceleration pattern (-41% commit velocity change in Q4 2026) is the type of signal that has historically preceded fundraise announcements by three to six weeks. Investors should cross-reference this signal with other sources (Crunchbase, hiring activity, community mentions) before drawing conclusions.
How does urlaubsverwaltung compare to other hr tech startups?
urlaubsverwaltung is tracked in our HR Tech sector rankings for Q4 2026. View the full sector ranking at signals.gitdealflow.com/startups-to-watch/hr-tech-q4-2026 to see how it compares on commit velocity, contributor count, and signal type against other hr tech startups.
View Full Sector Rankings
Related Resources
View urlaubsverwaltung in HR Techsector →
See how urlaubsverwaltung ranks among HR Tech startups on gitdealflow.com
Benchmark urlaubsverwaltungvs 356 startups →
Compare engineering velocity across the entire VC Deal Flow Signal dataset
Find startups like urlaubsverwaltung→
Discover similar startups with comparable engineering signals and momentum
Check urlaubsverwaltung's velocity →
Get a detailed velocity analysis and engineering report card
Show this badge on your README
Free, auto-updating SVG badge for urlaubsverwaltung. Embeds in GitHub READMEs, websites, and pitch decks.
[](https://signals.gitdealflow.com/startup/urlaubsverwaltung)See all badge styles →